The Fairburn Heating Solutions engineers have been racking up the miles recently, visiting clients in all parts of the British Isles.
Craig, Harrison & Sean travelled to Wastecare in Sandwich Kent, adding a high velocity burner to the end of the medical incinerator to improve performance & reduce downtime caused by product sticking to the incinerator internals This was a project designed by Kempston Controls Thermal Solutions division. The project was handed over by James Brown representing us.
The incinerator now has capacity to run at temperatures over 1200°C.
Craig, Dan, Sam, Jay and Harrison all headed to the Isle of Skye to install 14 gas meters for Mowi which will support their energy efficiency drive and carry out their annual dryer service and also to upgrade flame sensing on dryer 2 to self-checking UVs on three of the burners
Sean, Dan, Fin, Harrison then returned to MOWI to install 5 x Ratiomatic burners supplied by Kempston Controls to dryer 1 to allow the customer to run at much lower temperatures to suit the new product requirements.
Sean was in Ireland at the Eviosys canning plant in Athy, County Kildare to install a new modulating gas valve to an existing canning line that failed.
So wherever you are in the UK or Europe, if you would like to talk about your process gas heating design, installation or maintenance, call us today on 01886 358 025, send an email to totalsolutions@fairburnhs.com or use the contact form on our website.